翻訳と辞書 |
Central Spine Road : ウィキペディア英語版 | Central Spine Road
Central Spine Road, Federal Routes and is a new highway under construction in the central of Peninsula Malaysia, Malaysia. It is a toll-free highway. The 325 km (201 miles) highway replaces the former 2-lane Gua Musang Highway and Karak-Tampin highway. The construction first starts on Package 3 which is from Merapoh to Kampung Relong. The reason why it starts there first because the Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway had a long eco-viaduct built there. The next package that is to be built next will be Package 5 which is from the northern Raub till Karak which will connect it to the Karak Highway bypassing Bentong & Mempaga. This will also avoid the steep mountainous grade between Raub & Bentong. == Route background ==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Central Spine Road」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|